Water Worker G12L Guía de instalación Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
INSTALLATION INSTRUCTIONS
Read completely before proceeding and
refer to typical installation diagram and photos.
1. Measure pre-charge pressure with a
tire gauge to ensure pressure is the
same as water pressure. Tank comes
charged to 40 psi. Increase pressure
as needed.
4. Open hot waer faucet to relieve
pressure. Close faucet when pressure
subsides (flow stops).
Typical “Completed” Installation
2. Turn water heater to the lowest
temperature setting.
5. Apply Teflon
®
tape to tank threads.
3. Shut off water supply main valve.
6. Screw tank into saddle valve.
IMPORTANT, use wrench flats to
tighten tank into position.
Vista de pagina 4
1 2 3 4 5 6 7 8 9 10 ... 23 24

Comentarios a estos manuales

Sin comentarios